Home / Expert Answers / Computer Science / practice-exam-module-enterprise-data-centre-comp-20030-level-2-max-marks-100-duration-1-h-15-pa982

(Solved): Practice Exam Module: Enterprise Data Centre (COMP 20030) Level:2 Max. Marks: 100 Duration: 1 h 15 ...






Practice Exam
Module: Enterprise Data Centre (COMP 20030)
Level:2 Max. Marks: \( 100 \quad \) Duration: 1 h 15 min
Instructio
You are working in XYZ LLC and your company is upgrading the data center as a enterprise network engineer you are assign a ta
Practice Exam Module: Enterprise Data Centre (COMP 20030) Level:2 Max. Marks: Duration: 1 h 15 min Instructions to Student: - Answer any five questions. Each question carries 20 marks. The following LOs are achieved by the student by completing the Exam successfully: 1. Analyze the core values that must be taken into consideration when designing an enterpras, Data Centre. 2. Evaluate existing solutions to avold Hazards 1. You are working in and your company is upgrading the data center as a network eneineer you are assign a task to discuss the different type of safety measurement in planning of upgrading data center. (20 Marks) 2. Human health and safety should be one of the most significant considerations in disaster prevention and recovery for a Data Center. Discuss any four hatard precautions that need be taken in the design and maintenance of the data center and support areas to prevent from fire hazards. (20 Marks) 3. Flaborate any five security procedures that should be implemented to prevent unauthorized access and monitor physical incursions. (20 Marks) 4. Compare and contrast between building budget and running budget plan for data Centre projects. (20 Marks) MLC_2WO Trm_002,03 You are working in XYZ LLC and your company is upgrading the data center as a enterprise network engineer you are assign a task to discuss any two types of fire suspension systems. (20 Marks) 6. Discuss the importance of the System Availability Profiles with minimum of 2 points and study at least 4 types of system redundancies that can be determined when analyzing different availability profiles. (20 Marks)


We have an Answer from Expert

View Expert Answer

Expert Answer


ANSWER 1: There are several safety measures that should be considered when planning the upgrade of a data center:Fire suppression: It is important to