Home / Expert Answers / Mechanical Engineering / assume-an-investment-costs-of-2-500-per-charge-point-annual-cost-for-grid-connection-and-servic-pa691

(Solved): Assume an investment costs of 2.500 per charge point. Annual cost for grid connection and servic ...



Assume an investment costs of €2.500 per charge point.

Annual cost for grid connection and service are €400

Expected turnover is 6.000 kWh/year

Electricity price (buy) €0,15/kWh

Electricity price (sell) €0,30/kWh

What is the payback time of the investment?

And Again,

Assume the same case as above. Now only the annual costs are €1.000/year. What should the sales price of electricity be if you want a payback period of 5 years?